  • 2,000–50,000 CMH per AHU (typical)
  • PLC/HMI with BMS integration
  • TDF/TDC flange ducting
Double-skin air handling unit connected to insulated supply and return ducting

Advanced AHU & Cooling Systems

Precision HVAC for Cleanroom Environmental Control

The HVAC system is the heart of a cleanroom. Our systems are engineered to maintain the required air cleanliness, temperature, humidity, pressure relationships and airflow pattern.

AHU Features

  • Double-skin construction
  • Thermal/acoustic insulation
  • Fresh-air section
  • Mixing section
  • Cooling coil
  • Heating coil where required
  • Pre-filtration
  • Fine filtration
  • HEPA filtration
  • Variable-frequency drives
  • EC fan options
  • Differential pressure monitoring
  • Temperature and RH monitoring
  • BMS/PLC integration

Typical Capacity

2,000–50,000 CMH per AHU

With larger systems available through multiple AHUs or custom-engineered configurations.

Filtration — typical stages may include

  1. Pre-filter
  2. Fine filter
  3. HEPA terminal / HEPA section

Final filtration strategy depends on the cleanroom classification and process.

HVAC Applications

  • Cell therapy laboratories
  • BMT facilities
  • Injectable manufacturing
  • Aseptic processing
  • IVF laboratories
  • Medical-device manufacturing
  • Sterile laboratories

Electrical Control & Automation

Intelligent Cleanroom Environmental Control

Our electrical and automation systems provide centralized monitoring and control of critical cleanroom parameters.

Features

  • PLC-based control
  • HMI touchscreen
  • Temperature monitoring
  • RH monitoring
  • Differential pressure monitoring
  • Fan status
  • Filter differential pressure
  • Alarm management
  • VFD control
  • Emergency shutdown
  • Data logging
  • BMS integration
  • Remote monitoring options

Typical Electrical Capacity

Typical values
Typical Electrical Capacity (typical values)
SystemTypical Range
Control panels415 V, 3-phase
PLC systemsApplication-specific
VFD0.75–75 kW typical
AHU motor controlApplication-specific
BMS communicationModbus/BACnet options
Cleanroom HVAC control panel with a touchscreen HMI, indicator lamps, selector switches and an emergency stop button

TDF HVAC Ducting Systems

Precision Air Distribution & Return-Air Ducting

We manufacture and install cleanroom HVAC ducting designed for controlled airflow distribution.

Features

  • TDF flange construction
  • GI ducting
  • SS ducting options
  • Smooth internal surfaces
  • Low-leakage construction
  • Thermal insulation
  • Acoustic treatment where required
  • HEPA terminal connections
  • Supply and return air systems
  • Fresh-air systems
  • Exhaust systems

Typical Construction

Typical
Typical Construction (typical)
ApplicationMaterial
General cleanroom HVACGI
Critical/exposed areasSS 304
High-corrosion applicationsSS 316/316L
InsulationClosed-cell / approved insulation system
FlangeTDF/TDC

Duct sizing is calculated from required airflow, pressure drop, velocity and system balancing rather than a fixed duct size.

Rectangular galvanised supply ducting suspended above a cleanroom with a stainless-steel pass-through
Insulated supply ducting and HEPA terminal drops above an open cleanroom ceiling grid
Close-up of a galvanised duct corner showing TDF flange and corner-piece construction

Start a project

Build Your Next Controlled Environment With Us

Whether you are establishing a medical-device manufacturing unit, CAR-T cell therapy facility, MSC laboratory, BMT center, IVF laboratory, or injectable biopharma facility, our engineering team can develop a complete cleanroom solution around your process.

Send us

  • Project location
  • Approximate area
  • Process description
  • Required cleanroom classification
  • Existing architectural drawing
  • Equipment list
  • Target completion date

We can provide

  1. Concept Layout
  2. Technical Proposal
  3. BOQ
  4. Engineering
  5. Manufacturing
  6. Installation
  7. Validation
CallRequest a Consultation